Cut only when you have to.
End cap molding installation.
A slimtrack and slimtrack shim is included for a secure installation.
We pride ourselves in producing stylish durable home improvement products.
Sweep and clean your new laminate to remove dust and any scraps.
Versatrim is the leading laminate molding brand in north america.
Start at one end and install.
Browse our gallery to find the perfect floor for your home.
1 how to cap the open end on crown molding 2 how to use a miter box to cut trim 3 how to cut a baseboard with a miter box 4 how to cut crown molding with a jigsaw 5 how to install quarter round molding 6 how to measure the angles for carpentry trim work.
1 3 8 inch x 5 16 inch x 94 inch.
Lay down a strip of glue and put the end cap in place pushing it snug against the vertical surface with the other end covering the edge of the vinyl plank.
End cap molding for laminate flooring select surfaces.
Sand the base of the end cap only the portion that will be touching the sub floor.
Step 2 install the flooring planks including the underlayment by leaving a v inch 25mm gap for the installation of the molding step 3.
Use versatrack metal track for 6 9 5 mm floors.
Make sure to use full strips of molding along long walls.
No minimum orders on laminate molding.
The compact slim cap transition molding is a moisture resistant end cap threshold or carpet reducer.
6 9 5 mm floors.
The best way to install the cap molding is to start at one end of the room and work your way around to the other side.
To start the installation lay a piece of cap molding in the position on top of.
The surface material consists of hard wearing aluminum oxide laminate with a pvc core.
Molding installation guide show comments you may like.
Call 1 866 200 8132 for a free sample book.
Slide one dowel into molding groove and position in center of molding.
This youtube video will show diyers how to install crown molding easily and accurately.
Gather tools needed click here to find out which tools you ll need for your installation.
Install your flooring up to the vertical surface leaving a 1 2 3 4 gap to accommodate the end cap.
Install the flooring planks including the underlayment by leaving a 1 1 8 inch 28mm gap for the installation of the end cap molding.
Space dowels 11 5 apart and 1 5 from ends.
Skip to the end of the images gallery.